Okane completed a detailed engineering design and construction plan for remediation of the tailings deposits at an abandoned mine site.

Construction design were to meet the expectation of regional and national regulators, and the local communities.  The design included a water-shedding cover system and landform, a surface water management system, and revegetation plan that considered the wide range of seasonal climate variations. Additionally, Okane prepared technical specifications, a comprehensive QA/QC program, schedules, and cost estimates, and provides on site oversite for the construction phase of the project.