Gold Mine, East Africa

This project included conceptual water infrastructure design of numerous waste dumps and tailings facilities, spanning over 1000 ha.

Hydrological assessments were undertaken to provide the input variables for landform modelling and cover system designs. Water management design advice for ongoing operation together with conceptual mine closure including engineering design for water management within the mine waste facility catchments were provided.

Water Management - Whistle Mine 2006